References
PIONNER 2009
Project of JNEIN NORD FIELD
Works of grit blasting and painting of the steel structures, storage tanks and pipes of the whole station of JNEIN Nord field
See moreCHEVRON 2008-2009
work of blasting and painting of a pipe line (65 000 m2) : Black pipes and stainless steel.
Certification
See moreALSTOM POWER Central Electrique Ghannouch 2009-2010
Work of grit blasting and painting of 12 storage tanks inside and outside, metal structures of gas turbines, metal frames and other equipments.
Certification
See moreENI GAS SICILSALDO Station KORBA 2009
work of grit blasting and painting of a tank from the outside and inside, piping, gas separators, metal structures Hangar.
Certification
Certification
See moreTAV TUNISIA Aéroport ENFIDHA 2009
work of grit blasting and painting of two tanks JET A1 from outside and inside
Blasting and painting of the airport steel structures and tower steel structures
C...
See more